Data Entry: Please note that the research database will be replaced by UNIverse by the end of October 2023. Please enter your data into the system https://universe-intern.unibas.ch. Thanks

Login for users with Unibas email account...

Login for registered users without Unibas email account...

 
Linking Europe - The Role of the Swiss Electricity Transmission Grid until 2050
JournalArticle (Originalarbeit in einer wissenschaftlichen Zeitschrift)
 
ID 3346346
Author(s) Schlecht, Ingmar; Weigt, Hannes
Author(s) at UniBasel Weigt, Hannes
Schlecht, Ingmar
Year 2015
Title Linking Europe - The Role of the Swiss Electricity Transmission Grid until 2050
Journal Swiss journal of economics and statistics (SJES)
Volume 2015
Number 2
Pages / Article-Number 39-79
Keywords Switzerland; energy transition; network extension; investment delay
Abstract The aim of this paper is to evaluate the role of the Swiss electricity transmission system and the planned network extensions in the context of Central European electricity market developments and thereby the Swiss and European energy transitions. In addition, we conduct a sensitivity analysis of delayed grid investments for Swiss and European network projects, respectively. By deriving a quantification of potential costs and system stability impacts due to delayed network investments, we can identify whether the currently observed lag in many energy investments poses a threat to achieving the envisioned energy transitions.
Publisher Peter Lang
ISSN/ISBN 0303-9692
URL https://ideas.repec.org/a/ses/arsjes/2015-ii-2.html
edoc-URL http://edoc.unibas.ch/40283/
Full Text on edoc No
Document type (ISI) article
 
   

MCSS v5.8 PRO. 0.330 sec, queries - 0.000 sec ©Universität Basel  |  Impressum   |    
19/04/2024